In plain English: the Building Safety Levy

The Savills Blog

In plain English: the Building Safety Levy

The Building Safety Levy came into force in England on 1 October 2026, introducing a new development cost for most residential schemes of 10 or more homes calculated by reference to chargeable residential floorspace.  


What is the Building Safety Levy?

The Building Safety Levy, (applicable in England via the Building Safety Levy (England) Regulations 2025 – ‘the regulations’), is intended to make the residential development industry contribute towards the cost of remediating historic building safety defects. The government expects it to raise approximately £3.4 billion over the next 10 years.

The levy is separate from the Community Infrastructure Levy (CIL) and Section 106 regimes. It is administered through the building control process, and the relevant local authority acts as the collecting authority.

 

What does the Building Safety Levy mean for developers?

The levy has important implications for both development appraisals and delivery programmes.

As the levy must be paid by the earlier of either first occupation or the relevant completion notice date for any unit covered by the building control application, developers should give careful consideration to the timing and scope of applications. This may avoid a single trigger event bringing forward payment of the levy across more units than necessary.

When did it come into force?

The levy applies to relevant building control applications (not planning permissions, although the wider planning permission is relevant) made on or after 1 October 2026. As such, it will effectively apply to many planning permissions that were granted before 1 October 2026 where the building control application was not made before that date.

For the purposes of this article, the term ‘building control application’ is used generally, and the levy applies similarly whether the scheme is entering the building control process through a full plans application, an initial notice, or a higher risk building application.

Which developments will this apply to?

Broadly, a building control application is chargeable where:

  • the works create new residential floorspace, including through a new building, extension or change of use; and
  • the works constitute, or form part of, a planning permission for Major Residential Development(MRD), defined as providing at least:
    • 10 net additional dwellings or;
    • 30 net additional purpose-built student accommodation bedspaces

The charge cannot be avoided by submitting multiple small building control applications, if the overarching planning permission comprises MRD. It can, however, effectively be phased over a larger planning permission as the levy relates to the chargeable floorspace within the scope of its respective building control application.

How is the levy calculated?

Chargeable residential floorspace × applicable local authority rate per square metre

Chargeable floorspace is measured on a gross internal area basis, using the principles in the RICS Code of Measuring Practice, 6th Edition. It includes the floorspace of chargeable dwellings and shared residential communal areas such as lobbies, corridors, stairways, plant rooms and residents’ facilities (where such communal areas are to be used by both chargeable and exempt units, then a proportion of the communal area will be chargeable, on a pro-rata basis).

For extensions, conversions and reconfiguration projects, the levy generally applies to the net additional chargeable residential floorspace created by the works. The creation of residential floorspace through the conversion of an existing office or other non-residential building can therefore attract the levy even where the building’s external footprint does not change.

 

Where are the rates found?

The rates are published in the government’s Building Safety Levy Guidance and set out by local authority area. Each authority has:

  • a standard rate for land that does not qualify as previously developed land (PDL);
  • a reduced rate (at a 50% discount) where 75% of the overall planning permission (not the individual building control application phase) red line area qualifies as PDL.

Are the rates indexed?

Unlike CIL, there is no automatic annual indexation mechanism. The published rate should therefore be applied when the liability is determined, without applying an additional inflation index.

However, the rates are not necessarily fixed for the life of the levy. The secretary of state must review both the operation of the regulations and the area rates, with the first report required within three years of commencement and subsequent reports at intervals of no more than three years. Government guidance indicates that reviews may consider levy receipts, remediation costs, exclusions and wider housing market conditions.

 

What/who is exempt?

  • Small developments – developments providing fewer than ten net additional dwellings, or fewer than 30 net additional student bedspaces, provided they are not part of a wider MRD planning permission area;
  • Social housing – within the meaning of Schedule 2 to the regulations;
  • Non-profit registered providers of social housing – exempt persons to whom the levy will not be chargeable (which has implications for market-sale homes being delivered by such entities);
  • Other specified forms of accommodation – set out within Schedule 2 to the regulations, including school accommodation, care homes and secure residential institutions.

When is the levy payable?

Detailed levy information and supporting evidence are provided at commencement stage, enabling the collecting authority to issue either a levy liability notice or a notice of no charge. The liability becomes payable when the levy liability notice is issued and the payment deadline is the earlier of:

  • the developer’s submission of statutory notice confirming that the building work is complete (the completion notice date); and
  • the first occupation of any building, or part of a building, covered by the chargeable building control application or initial notice.

Where a building control application covers several buildings, first occupation of one of those buildings will bring forward the payment deadline for the levy attributable to the whole building control application. Developers should therefore consider whether the building control application and phasing strategy are aligned with the intended delivery and occupation programme.

If the levy remains unpaid, the relevant completion certificate will be withheld, or final certificate rejected. Payment should therefore be programmed sufficiently ahead of occupation and completion to avoid delaying practical completion, handover or sales.

 

What should developers do now?

Developers should scrutinise the phasing and scope of building control applications. However, this needs to be balanced against securing building control approval in sufficient time to avoid delaying construction, handovers or disposals.

Registered Providers are potential beneficiaries, generally being exempt from the levy, and may look to make use of this competitive advantage when bidding on land for the delivery of schemes providing both affordable and market housing.

The levy gives developers one more reason to phase carefully: the first completed home should not inadvertently come with the bill for all the others.

 